Free NACE NACE-CIP2-001 Dumps are shared online. You can view and discuss NACE NACE-CIP2-001 questions and answers for free below. FreeCoating Inspector Level 2 Exam Questions.


   
Quote
Topic Tags
(@moschettorocco)
Estimable Member
Joined: 3 months ago
Posts: 132
 

You are the NACE Coating Inspector on a tank lining project and are asked to perform a high voltage holiday test after the coating applicators have completed their final repairs. After meeting all the confined space entry permit you enter the tank and notice a very strong odor of solvent.

Your first course of action should to:

  • A . Investigate to find the source of the odor
  • B . Don your air supplied respirator and continue the testing
  • C . Exit the tank and immediately and report the problem to the nearest safety supervisor
  • D . Exit the tank and document the incident in your daily report

Show Answer Hide Answer

Suggested Answer: C

   
ReplyQuote
(@raverelmer)
Estimable Member
Joined: 2 months ago
Posts: 119
 

You are working as an inspector in a galvanizing plant for the first time.

What are some of the hazards you need to be aware of:

  • A . Risk of chemical exposure
  • B . Risk of skin
  • C . Risk of acid or caustic splashes
  • D . a), b), and c)

Show Answer Hide Answer

Suggested Answer: D

   
ReplyQuote
(@printzdelbert)
Estimable Member
Joined: 2 months ago
Posts: 128
 

You are working as the only in-house NACE Level 2 Inspector in a shop setting when an independent 3 rd party NACE Level 3 Inspector, representing the owner, presents you with a copy of a Non Conformance Report (NCR) he has written for a NACE2/SSPC SP 10 centrifugal blast which you had previously approved.

Your FIRST preferred course of action is to:

  • A . Verbally challenge the NCR
  • B . Request a re-blast of the item in question
  • C . Consult your supervisor
  • D . Review the NCR with the other Inspector

Show Answer Hide Answer

Suggested Answer: C

   
ReplyQuote
(@secundaantonio)
Estimable Member
Joined: 2 months ago
Posts: 140
 

An Inspection and Test Plan is required when:

  • A . It is always required
  • B . When the Coating Applicator requests one
  • C . When the Owner specifies one
  • D . When the Inspector requests one

Show Answer Hide Answer

Suggested Answer: A

   
ReplyQuote
(@lessmannbernie)
Estimable Member
Joined: 2 months ago
Posts: 113
 

The Inspectors' goal at the Pre-Job Conference is to:

  • A . Obtain a clear understanding of the Specification
  • B . Discuss contractual requirements
  • C . Manage the meeting so it doesn't go off topic
  • D . Take accurate meeting minutes for distribution

Show Answer Hide Answer

Suggested Answer: A

   
ReplyQuote
(@schoppertscotty)
Estimable Member
Joined: 3 months ago
Posts: 114
 

Coating Surveys are legally required:

  • A . On commercial marine vessels and offshore platforms
  • B . On high pressure gas lines and fireproofed structures
  • C . On water tanks and potable water pipelines
  • D . On food and beverage vessels and can linings

Show Answer Hide Answer

Suggested Answer: A

   
ReplyQuote
 Pete
(@spurgerspete)
Estimable Member
Joined: 2 months ago
Posts: 131
 

Individuals conducting Coating Surveys should:

  • A . Always be NACE Level 3 Certified Inspectors
  • B . Always be NACE or SSPC Protective coating Specialists
  • C . Always be experienced Specification Writers
  • D . Always be trained and experienced Coating Industry

Show Answer Hide Answer

Suggested Answer:

   
ReplyQuote
(@boenjordan)
Estimable Member
Joined: 2 months ago
Posts: 148
 

The cost of qualified Coating Inspection is normally offset by:

  • A . Lower Application Costs
  • B . Lower Coating Life Cycle Costs
  • C . Lower Safety Enforcement Costs
  • D . Lower Supervision Costs

Show Answer Hide Answer

Suggested Answer: B

   
ReplyQuote
(@ruanfreeman)
Estimable Member
Joined: 2 months ago
Posts: 123
 

You are a NACE Level 2 Coating Inspector who has just arrived on a job in progress where there is no Inspection and Test Plan (ITP). The first morning you arrive the job is behind schedule and you are asked to take DIY Film Thickness readings.

Your FIRST preferred course of action is to:

  • A . Refuse to take readings until an is in place
  • B . Develop your own methodology and proceed take the readings
  • C . Use a generally accepted industry standard and to take readings
  • D . Call your supervisor

Show Answer Hide Answer

Suggested Answer: C

   
ReplyQuote
(@chesnutanibal)
Estimable Member
Joined: 3 months ago
Posts: 119
 

When conducting inspections the Inspector should follow which standards:

  • A . NACE and SSPC standards in North America
  • B . ISO standards in Europe and Asia
  • C . Australian standards in Australia
  • D . The specified standards

Show Answer Hide Answer

Suggested Answer: D

   
ReplyQuote
(@telabrian)
Estimable Member
Joined: 3 months ago
Posts: 132
 

You are the NACE Level 2 Coating Inspector where SSPC PA 2 has been specified with an additional requirement that no individual gauge reading shall be below a certain value.

As this is not part of the standard you should:

  • A . Ignore the additional requirement
  • B . Enforce the additional requirement
  • C . Call your supervisor
  • D . Request clarification from the specifier

Show Answer Hide Answer

Suggested Answer: B

   
ReplyQuote
(@leibensteinnorman)
Estimable Member
Joined: 2 months ago
Posts: 136
 

The coating applicator has ignored a enface preparation hold point and applied coating over the surface without a sign off from you as the inspector.

Your FIRST preferred course of action is to:

  • A . Stop the job
  • B . Require the Applicator to remove the coating
  • C . Advise the Owner and write a Non-Conformance report
  • D . Ignore the situation

Show Answer Hide Answer

Suggested Answer: B

   
ReplyQuote
(@maccauleybernie)
Estimable Member
Joined: 2 months ago
Posts: 121
 

In the event of a conflict between the Product Data Sheet and the Specification:

  • A . The Product Data Sheet prevails
  • B . The Specification prevails
  • C . It is up to the Inspector to decide which one to follow
  • D . It is up to the Applicator to decide which one to follow

Show Answer Hide Answer

Suggested Answer:

   
ReplyQuote
 Gus
(@heikesgus)
Estimable Member
Joined: 3 months ago
Posts: 144
 

From a corrosion perspective, the main difference between Ferrous and Non-Ferrous Metals is:

  • A . Cost
  • B . Iron content
  • C . Appearance
  • D . Safety

Show Answer Hide Answer

Suggested Answer: B

   
ReplyQuote